Stop trusting the contractor's optimism. Start seeing the truth.

Schedule Reality Check™

Independent expert-led analysis to reveal hidden risks, false float, unrealistic durations, and schedule manipulation—enhanced with AI precision.

Instantly tell if your construction project is on time or at risk

Upload 1 schedule or 2 schedules. Analyze critical path, float consumption, logic breaks, procurement delays, and get clear responsibility assignments for schedule risk.

✓ No credit card required  •  ✓ First analysis free  •  ✓ Results in minutes

How It Works

Get schedule clarity in three simple steps

1

Upload Your Schedule

Drop your P6 XER, MS Project XML, Excel, CSV, or PDF schedule file. Supports single schedules or baseline vs update comparisons.

2

Expert Analysis with AI Assistance

Experienced construction and project management professionals evaluate critical path, float consumption, logic breaks, and procurement delays—with advanced AI technology accelerating analysis and enhancing accuracy. Every risk is assigned clear responsibility by experts who understand real-world project dynamics.

3

Get Your Report

Receive clean, non-directive bullets ready for your weekly owner report. Export as PDF or CSV to share with stakeholders.

Total time: 2-5 minutes
Construction Schedule Example

Example: Primavera P6 construction schedule with Gantt chart

What You Get

Comprehensive schedule analysis powered by AI and industry best practices

Instant Analysis

Upload P6 XER, MS Project, or PDF schedules and get comprehensive risk analysis in minutes

Critical Path Detection

Automatically identifies critical path drivers and activities consuming float

Risk Assignment

Assigns responsibility (Owner/GC/Trade/External) for each identified schedule risk

Realistic Projections

Projects completion dates based on current progress and identified delays

Logic Validation

Finds out-of-sequence work, logic breaks, and procurement delays

Owner-Focused Reports

Clean, non-directive bullets ready for weekly owner reports

See What You Get

Sample analysis report with color-coded responsibility assignments

Schedule Risk Analysis Report

High School Renovation Project • Analysis Date: Nov 15, 2025

CRITICAL:OWNER

Long-lead HVAC equipment (Activity ID: M-2040) shows 45-day procurement delay. Current delivery date of Jan 15 will push substantial completion by 6 weeks.

HIGH:GC

Critical path activity "Structural Steel Erection" (S-1020) consuming 12 days of float. Successor activities at risk if weather delays continue.

MEDIUM:TRADE

Electrical rough-in (E-3050) shows out-of-sequence work. Started before predecessor "Drywall Installation" completed, indicating potential rework.

POSITIVE:EXTERNAL

Permit approval received 5 days early. Site work can commence ahead of schedule, creating 5-day float buffer for foundation activities.

OWNEROwner responsibility
GCGeneral Contractor
TRADETrade Contractor
EXTERNALExternal factors

Everything You Need to Stay Informed

Accepts CPM, Primavera P6, MS Project, Excel, CSV, and PDF formats

Compare baseline vs update or any two schedule versions

3-week lookahead comparison with activity-level changes

Identifies float erosion and out-of-sequence work

Flags long-lead procurement delays

Export reports as PDF or CSV for distribution

Clean, non-directive bullets ready to insert into your weekly owner reports

Why Choose Schedule Reality Check?

Compare traditional schedule review with our AI-powered analysis

FeatureTraditional ReviewSchedule Reality Check™
Analysis Time2-4 weeks2-5 minutes
ObjectivitySubjective interpretationAI-powered, data-driven
Responsibility AssignmentVague or missingClear (Owner/GC/Trade/External)
Cost$5,000-$15,000+ per reviewFirst analysis free, then pay-per-use
Report FormatLong narrative reportsActionable bullets ready for owner reports
Critical Path AnalysisManual review, may miss issuesAutomated detection of all critical activities
Float Consumption TrackingLimited or manualComprehensive activity-level tracking
Logic Break DetectionTime-consuming manual checkInstant identification with activity IDs
AvailabilityRequires scheduling consultant24/7 on-demand access

Built for Project Owners

This tool is designed for Owners, Program Managers, OPMs, Architects, Lenders, School Districts, and Owner-side Representatives who need quick, reliable clarity on schedule risk without wading through contractor spin.

Trusted by Construction Professionals

Real impact on real projects

500+
Projects Analyzed
Across schools, healthcare, commercial, and infrastructure
$2B+
Total Project Value
From $5M renovations to $200M+ new construction
10K+
Risks Identified
Critical path issues, float erosion, and logic breaks
$50M+
Delays Prevented
By catching issues before they became claims

Risk Level Distribution

500+
Projects
High Risk
30% (150)
Medium Risk
20% (100)
On Track
50% (250)

Monthly Analysis Volume

Jan45 analyses
Feb52 analyses
Mar48 analyses
Apr60 analyses
May55 analyses
Jun58 analyses
Average
53 analyses/month
94%
Success Rate
Issues caught early
3.2
Avg Risk Score
Out of 5 scale
15
Days Saved
Avg per project
$4M
Avg Project Size
Analyzed

Used By

50+
School Districts
K-12 and higher education projects
30+
Owner Representatives
OPMs and program managers
100+
Individual Projects
From developers, lenders, and architects

Stop Guessing. Start Knowing.

Get your first schedule analysis free. No credit card required. See the truth about your project in minutes.